The City of Saint Paul Department of Parks and Recreation has secured funding to provide transportation improvements at Como Regional Park. This project will provide improvements to pedestrian, bicycle and vehicular circulation, as well as, additional parking.

The master plan that was developed during the Como Regional Park Pool Replacement project will be the starting point of this project. Current traffic data and user feedback will supplement an analysis and review of the previous plan as a means to identify where improvements in that plan can be made.

Project Resources

Proposed Plan
Background Information
Preliminary Design Concepts
Workshop #2 - Response Memo

Project Updates

October 28, 2016

The following is a list of what has been completed and what has yet to be completed.

Completed:

  • All the curb and gutter is in
  • Base course of bituminous placed
  • Most of the bituminous and concrete trails and sidewalks are complete
  • All sewer utility is complete
  • Street lighting is nearly complete

To do yet:

  • The contractor will be dormant seeding in the next two weeks
  • Wear course of bituminous will be placed November 7-10 along with striping and signs
  • Complete restoration of softball field
  • Complete trail from Jessamine north to Pool parking lot
  • All trees, shrubs, and perennials will be planted in the spring

Work is scheduled to be completed around November 11, 2016.

September 16, 2016

Wynne Avenue will close on September 21st.

Jessamine Avenue will reopen to traffic on September 21st to provide access to McMurray Field.  Vechicular access to Jessamine will be from the west off Hamline Avenue and be directed by detour signs.  Jessamine will operate as a two way road with a turn around at the eastern end by the warming house.  Parking will be available on the north side of the road.  Parking will also be available on Beulah as it has been for the past 4 weeks.  A graphic illustrating the detour, circulation/parking arrangements, and field access can be viewed here.  

September 9, 2016

Jessamine will remain closed until about Wednesday September14th.  During this closure, the eastern section of Wynne will remain open to provide access to the soccer fields.  A walkway is provided between the pool parking lot and the fields.  When work on Jessamine is complete, Jessamine will reopen and Wynne will be close for the duration of the project.

August 11, 2016

Jessamine Avenue will close on August 15 and reopen on September 6.  Wynne will be closed west of the Como Pool parking lot.  Access to the softball and soccer fields will be from the north and parking available in the Como Pool Parking lot.  On September 6 (after the pool closes), Wynne Avenue will close for the duration of construction.  Access to the fields and parking will be available along Jessamine Avenue.

A graphic illustrating the road closures can be viewed here.

August 3, 2016

Construction will begin the week of August 8.  Phasing of the construction project with reference to road closures/detours and field access will be posted early next week.

June 27, 2016

Construction documents have been advertised for bids on July 14, 2016 at 2:00 p.m.  The bids will be reviewed and a contract awarded shortly thereafter.  We anticipate construction will begin in early August with a November completion.  The final overall plan can be reviewed here

April 25, 2016

Preparation of Construction Documents is underway.  We anticipate submitting the documents to the City of Saint Paul Department of Contracts and Analysis for advertisement in the next two weeks for a mid-June bid.  

  • Negotiations with the Burlington Northern Santa Fe railroad are still underway to develop parking in the railroad Right of Way.
  • Raised crosswalks are will be developed across Wynne at the existing pool parking lot and at the Como Woodland Outdoor Classroom parking lot.
  • Jessamine Avenue will be a 16' wide road with standard concrete curb and gutter.  This width of road is required by the fire department for fire truck access.
  • A new trail segment is being added between Beulah and the Como Woodland Outdoor Classroom parking lot.  There is a heavily worn path in this location and a durable pedestrian route will help accommodate this traffic pattern.

December 21, 2015

Thank you to all that attended the Como - McMurray Area Transportation Improvement Open House on Tuesday December 15.  Your feedback is very helpful to these improvements at Como.  The following links are to the proposed plan that was presented at the Open House and  feedback we received at the open house.

December 15, 2015

The City of Saint Paul will host a public open house for this project on Tuesday, December 15, 2015 to collect feedback on the proposed improvements. The event will take place at the Como Streetcar Station at 1224 Lexington Parkway, Saint Paul from 4:30 – 6:45 pm. There will be no formal presentation; however project staff will be available during the Open House to answer questions and to hear ideas from community members. The presentation material will be available for review and comment on the project website after the open house.

Parking is available onsite and Metro Transit Routes 3 and 83 stop nearby.

November 13, 2015

An open house has been scheduled to present the recommended transportation improvement plan for the McMurray area.  The open house will be held on Tuesday December 15, 2015 from 4:30 - 6:45 at the Como Streetcar Station (1224 Lexington Parkway N.)  Additional meeting format details will be provided in the next couple weeks.

November 2, 2015

On Tuesday October 27th, we had a very productive Design Workshop.  The following links are to the revised plan presented at the workshop and minutes.

October 19, 2015

The following link provides a summary document of the September 22nd Design Workshop.

September 25, 2015

Thanks to all that were able to attend our first Design Workshop for the Como Transportation improvements at McMurray. It was a great work session and provided some very valuable feedback for the project. The following link is to the presentation. Note: The file is very large (36 MB) so it may take a minute or two to download.

August 13, 2015

We have identified a number of community engagement opportunities. These opportunities include:

Pop-Up meetings Impromptu interviews/surveys will be held at various locations around McMurray Field to receive information from users. Pop up events are planned for the week of August 24th

Workshops City staff will be working with the Como Regional Park Advisory Committee to help guide conceptual designs for transportation improvements based on previous and current traffic data. Design Advisory Committee meetings are scheduled for September 22nd and October 27th.

Open House The Open House is an opportunity for the larger community to review and comment on the recommended transportation plan. An open house will be held on December 15th.