Description
A portion of Water Street was severely damaged when the Mississippi River flooded in 2019 and was closed during spring flooding.

Saint Paul Public Works worked to stabilize the embankment, reconstruct the road, and install a safety guardrail. The project also installed road gates for future flood-related closures.

Location
Water Street between the Lilydale Pool and Yacht Club and the public boat launch

Timeline
April 2019 to June 2021

Tags

    Project Updates

    Project Documents