Atlantic Street Main Replacement

Project Engineer: Kaitlin Swanson 651-266-6289

The original cast iron water main within the project area was installed in the mid-1950s and has experienced repeated main breaks over the years. To continue to ensure the reliability of our system, SPRWS regularly replaces aging infrastructure that may be susceptible to breaking with newer, more dependable infrastructure.

SPRWS will be hiring a contractor to replace the existing 6" cast iron water main with 6" HDPE pipe using a method called pipe bursting.

Project Scope:

  • Replace 700 ft of 6" water main
  • Replace valves and hydrants
  • Restore street pavement as needed

Project Updates

Contractor will be performing pre-work in the project area to prepare for project start later in the construction season. Specific start dates to be determined.