Barclay/Magnolia

The original cast iron water main within the project area was installed in 1961. It has suffered repeated breaks over the years and has exceeded its useful life.

SPRWS crews along with Quam Construction Co. will replace the existing 6” cast iron water main with 8” HDPE pipe via a trenchless method called pipe bursting.

This project is expected to begin in September of 2019.

Project Updates

Water main is installed on Barclay and Magnolia. Temporary water lines will come down and final paving will be done in the next few weeks.