Orme Main Rep

Project Engineer: Kaitlin Swanson 651-266-6289

There is no existing water main on Orme Avenue between Stryker and Hall. In order to create better flow conditions in the area, SPRWS will be hiring a contractor to install new 6" HDPE pipe using a method called directional drilling.

Project Scope:

  • Install 350 feet of 6" HDPE pipe
  • Install valves and connect to existing services
  • Restore street pavement as needed

Project Updates

Contractor will be performing pre-work in the project area to prepare for project start later in the construction season. Specific start dates to be determined.

Project Updates

Main replacement work is scheduled to begin in the next couple weeks.