The Procurement Division (Contract & Analysis Services) provides buying, contracting, and surplus disposal services to the City of Saint Paul, Saint Paul Regional Water Services, and the Saint Paul Port Authority.
In order to bid with the City of Saint Paul, businesses must register on the supplier portal at www.stpaulbids.com. Businesses do not need to be registered in the supplier portal to view opportunities. For a list of current solicitations, please visit www.stpaul.gov/publicadnotices.
All city contracts must meet Contract Compliance goals and requirements. The Contract Compliance and Business Development Division ensures that the entire community can participate in the economic life of the City of Saint Paul through the following programs: Affirmative Action & Equal Employment Opportunity (AA/EEO); Vendor Outreach Program; HUD Section 3; and, federal, state, and local Labor Standards requirements. To learn more, please visit:
Affirmative Action & Equal Employment Opportunity (AA/EEO)
Vendor Outreach Program and CERT Certification
Section 3 and Section 3 Registration
Forecasted Bidding Opportunities for 2018
Projects |
Descriptions |
Anticipated Release |
Potential SWMBE Opportunities |
Total Estimated Project Value |
---|---|---|---|---|
Parks & Recreation |
||||
Cherokee Play Area |
Improvements to Cherokee play area equipment and site furnishings. |
January |
Concrete, Landscape, Site Furnishings, play equipment |
$240K |
Parque Castillo - splashpad and play area |
Replace play area to meet current safety standards. Additionally, site improvements such as landscaping, walkways, and other site features. |
January |
Concrete, Landscape, Site Furnishings, plumbing |
$430K |
Indian Mounds R.P. Trail Reconstruction (Consultant) |
Professional services for trail engineering and environmental study |
February |
Professional Engineering Services |
$115K |
Como Park Carousel Plaza |
Construct a concrete plaza with pedestrian lights at the Como Park Zoo and Conservatory. |
February |
Concrete, Landscape, Electrical, irrigation |
$300K |
Rice Park |
Improvements include demo, landscaping, irrigation, electrical, site furniture. |
February |
Demo, Landscaping, Irrigation, electrical, site furnishings |
$1.3M |
Jimmy Lee play area |
The play area is to be renovated to replace old play equipment with new play equipment |
March |
Concrete, Landscape, Site Furnishings, play equipment |
$500K |
Marydale Play Area |
Replace old play equipment with new play equipment, additional site improvements to improve circulation, landscaping and site furnishings will also be included. |
February |
Concrete, Landscape, Site Furnishings, play equipment |
$250K |
Sylvan Play Area and Field Improvements |
Replacing old play equipment with new play equipment, and replacing the natural grass field with artificial turf. |
February |
Concrete, Landscape, Site Furnishings, play equipment, artificial turf |
$1.2M |
Lilydale Bluff Stabilization |
Grading, slope stabilization and restoration work. |
February |
Grading, slope stabilization, restoration |
$650K |
Swede Hollow Stormwater Improvements (dates tentative) |
This project includes replacement of storm sewer structures, installation of drain tile, minor earthwork to create swales, and pond dredging to improve surface water conditions in Swede Hollow Park. |
January |
storm sewer, draintile, earthwork |
$85K |
Scheffer Community Center |
Construction of a new 23,500 sf community center and associated sitework including a parking lot. |
March |
Complete building construction, asphalt parking lot, restoration |
$7M |
China Garden |
Construction of a Chinese Styled entrance gate and slab on grade foundation for a Chinese Styled pavilion, donor wall, trail and decorative paving, and landscaping. |
June |
Concrete, footings, landscaping |
$270K |
Highland Community Center Play Area Improvements |
The play area is to be renovated replacing old play equipment with new play equipment. |
January |
Concrete, Landscape, Site Furnishings, play equipment |
$300K |
Indian Mounds R.P. Cultural and Interpretive Plan |
Professional services to create a cultural and interpretive plan. |
December |
Professional Services |
$150K |
Public Works Streets |
||||
Saint Paul Streets Program |
3 major street reconstruction projects |
April/May |
Traffic Control, Concrete, Asphalt, Trucking |
$16M |
Margaret Bicycle & Ped Improvements |
Bicycle trail, bumpouts and traffic circles |
May |
Traffic Control, Concrete, Asphalt, Trucking |
$2M |
Grand Avenue Pedestrian Safety Improvements |
Traffic calming and pedestrian safety measure |
May |
Traffic Control, Concrete, Asphalt, Trucking |
$0.9M |
Safe Routes to School - Expo School |
Sidewalk construction |
May |
Traffic Control, Concrete, Asphalt, Trucking |
$0.8M |
Public Works Sewers |
||||
Sewer cleaning and televising projects - 2 projects |
Jet clean and televise city sanitary sewers, televise city storm sewers |
March |
Traffic Control |
$1.2M |
Riverview Lift Station Improvements |
Electrical, mechanical, and pumping equipment, misc concrete work |
May |
Portable Restrooms, Dumpsters, Traffic Control, Painting |
$1.8M |
Broadway Lift Station Renovation |
Electrical, mechanical, and pumping equipment, misc concrete work |
March |
Portable Restrooms, Dumpsters, Traffic Control, Painting |
$2.1M |
Phase 3- Phalen Storm Tunnel Rehab |
Dewatering, remove interceptor invert, construct reinforced concrete liner inside existing storm interceptor, pump grout |
September |
Portable Restrooms, Traffic Control, Fencing, Surface Restoration, Misc Supplies, Dumpsters |
$2.5M |
Citywide Sewer Repair |
Repair broken sewers via excavation |
October |
Traffic Control, Portable Restrooms, Dumpsters |
$0.5M |
Cherokee Heights Upper Ravine Stabilization |
Stabilization of ravine downstream of city culvert, earthwork, regrading, rip rap |
October |
Portable Restrooms, Traffic Control, Fencing, Surface Restoration, Misc Supplies, Dumpsters |
$1.0M |
Citywide Sewer Lining |
Line sewers, primarily sanitary sewer with cured-in-place pipe |
December |
Traffic Control, Portable Restrooms, Dumpsters |
$2.6M |
Saint Paul Police Maintenance |
||||
Black top replacement in parking lot at our K9,Citywide services and outdoor range |
3 potential asphalt projects |
2018 - 2019 |
Asphalt Replacement |
$100K |
Replace parking lot lights at our Citywide Services,Western District, K9, Eastern and outdoor range district team stations |
5 potential lighting projects |
2018 - 2019 |
Lighting upgrades |
$100K |
Replacing Floor tiles Eastern District mens locker room |
1 Floor tile replacement project |
2018 - 2019 |
Floor Tile replacement |
$40K |
Ceiling tile replacement for our Eastern District |
1 ceiling tile project |
2018 - 2019 |
Ceiling tile replacement |
$68K |
Saint Paul Regional Water Services |
||||
Preliminary Design - Treatment Plant Softening & Ozone Improvements |
Consulting Services |
Summer-Fall |
|
Pre-design $700k |
Noise Study – land fill site |
Consulting Services |
February |
|
$15k |
Corrosion Study Water Distribution System |
Consulting Services |
Fall |
|
$50k |
Raw Water Conduit Cathodic Protection System |
Consulting Services |
Summer-Fall |
|
$500k |
Leak Survey |
Consulting Services |
Summer-Fall |
|
$20k |
Water Tower Tank Painting Design |
Consulting Services |
Summer |
|