Project Details

Description
The original cast iron water main in the project area was installed in 1933 and has experienced repeated main breaks over the years. To continue to ensure the reliability of our system, SPRWS will be replacing the existing 6" cast iron water main with 6" ductile iron pipe. The scope of the project is as follows:

  • Replace approximately 400 feet of 6" cast iron water main with 6" ductile iron pipe
  • Replace necessary valves and hydrants in the project area
  • Repair, and restore street pavement, curb, and sidewalk as needed

Location
Carter Avenue from Eustis Street to Gordon Place

Timeline
Project is tentatively scheduled to begin in August of 2023

Contact
Project Engineer: Matt Dalrymple 651-266-6887

Carter project area

Last Edited: April 4, 2023