Project Details

Description
The original cast iron water main in the project area was installed in 1930 and has experienced repeated main breaks over the years. To continue to ensure the reliability of our system, SPRWS will be replacing the existing 6" cast iron water main with 6" ductile iron pipe. The scope of the project is as follows:

  • Replace approximately 100 feet of 6" cast iron water main with 6" ductile iron pipe
  • Repair, and restore street pavement, curb, and sidewalk as needed

Location
In the intersection of Hillcrest Avenue and Cleveland Avenue

Timeline
Project is tentatively scheduled for late April of 2023

Contact
Project Engineer: Matt Dalrymple 651-266-6887

hillcrest project area

Last Edited: April 4, 2023