Description
New sidewalk will be constructed to fill gaps in the neighborhood around Crossroads Elementary and RiverEast Elementary and Secondary in 2025. The new sidewalk will be on Front Avenue, Lawson Avenue, Kent Street, and Mackubin Street. 

New striping will be done on Front Avenue between Dale Street and Kent Street.

Location
Front Avenue, Lawson Avenue, Kent Street, and Mackubin Street

Timeline
2025

Tags

Construction Schedule

Punch list items start week of May 11, 2026

  • Expected length of punch list and final work on project is two weeks
  • Punch list items include: saw/seal hairline cracks, replace damaged sidewalk panels, some seal coating and sod installation for final stabilization
  • Sod installation is tentative for May 14 and May 15; work is dependent on weather and contractor scheduling; it may be necessary to push installation out one week
    • NOTE:  If property owners do not want sod installed on their street or side boulevards, please email the Project Manager Cheng Xiong at cheng.xiong@ci.stpaul.mn.us

Traffic Impacts

  • No Parking signs will be placed near work areas
  • Please use caution when navigating the construction area

All construction activities and traffic impacts are weather and schedule permitting and subject to change.

Help protect the new sidewalks this winter!

Salt harms new concrete. Try sand or grit instead.

To ensure long-lasting, durable concrete, please do not use salt or ice melt on newly poured sidewalks and roads this winter. Your participation is important to the quality and longevity of the concrete surfaces.

Why skip the salt?

  • New concrete is weakest during its first year
  • Salt accelerates the freeze/thaw cycle that could result in chipping or cracking of the concrete
  • Sand or grit (sold as chicken, poultry, or cherry stone grit) is a great alternative for increasing traction on icy surfaces

Project Updates

Project Documents