Description
Wabasha Street will be reconstructed to replace the roadway pavement, sidewalks, curbs, and underground utilities including water and sewer. The Capital City Bikeway will be installed on the west side of Wabasha Street in conjunction with this project.

Location

  • Wabasha Street between Kellogg Boulevard and 7th Street (reconstruct)
  • Wabasha Street between 7th Street and 11th Street (resurface)

Timeline
June 2022 to November 2022

Tags

    Project Documents