Description
The project is reconstructing Wheelock Parkway from Edgerton Street to Arcade Street to replace the roadway pavement, sidewalks, curbs, and underground utilities including water and sewer.
Additional project benefits:
- ADA-compliant pedestrian ramps
- Boulevard trees - to be planted after street construction
- Concrete outwalks and driveway aprons
- Lantern-style street lighting
- Private utility upgrades
- Water main upgrades
- Public art
- Sodded boulevards
- Storm sewer catch basins
Location
Wheelock Parkway from Edgerton Street to Arcade Street
Timeline
2022 - 2023
Video Presentation
Please watch the Wheelock Parkway Reconstruction Phase 5 presentation video to learn more about the project. You can also view the PowerPoint slides used in the video.
Project Updates
Project Documents
Water Main Replacement
Saint Paul Regional Water Services (SPRWS) will replace all lead water services from the water main to the property line (public right of way portion) as part of this project. If you have a lead water service from the property line to the water meter at your property (private portion), you can sign-up for SPRWS’ Lead Free Program to have this portion replaced at no cost. For additional information and to sign up for the Lead Free Program, visit www.stpaul.gov/water or call SPRWS’ Lead Free team at 651-266-6280.
As part of the road reconstruction project, SPRWS will be replacing the water main on Wheelock Parkway.
To continue to ensure the reliability of our system, SPRWS will be replacing the existing 8" cast iron water main with 8" ductile iron pipe. The scope of the main replacement work is as follows:
- Replace approximately 1,200 feet of 8" cast iron water main with 8" ductile iron
- Replace necessary valves and hydrants within the project area
SPRWS Contacts
- Project Engineer: Kaitlin Swanson 651-266-6289