Description
Summit Avenue will be reconstructed to include a new asphalt roadway, sidewalks, curbs and underground utilities including sewer and water. This project will improve the bicycle facilities, lighting, boulevard trees and sod. Improvements include:

  • Bituminous pavement
  • Boulevard trees
  • Concrete curb and gutter
  • Concrete outwalks and driveway aprons
  • Lantern-style street lighting
  • Private utility upgrades
  • Sewer and water main replacement or repair
  • Storm sewer catch basins

Summit Avenue design goals include maintaining historic character of the avenue, minimizing impact to existing trees, maintaining on-street parking on at least one side, improving the bicycle facilities, and improving efficient snow removal operations.

Street cross-sections will be guided by the Summit Avenue Regional Trail Plan.

Location

Summit Avenue Reconstruction project will improve Summit Avenue from Mississippi River Boulevard to Kellogg Boulevard. The first segment of this project on Summit Avenue from Mississippi River Boulevard to Fairview Avenue is scheduled to be completed in 2028.

Timeline

  • 2028 - Summit Avenue from Mississippi River Boulevard to Fairview Avenue is scheduled to be constructed
  • 2029 - Summit Avenue from Fairview Avenue to Hamline Avenue is scheduled to be constructed
  • Construction schedule for further segments of Summit Avenue is to be determined by the Common Cent plan
Tags

Summit Avenue Reconstruction Project Update: Tree Survey Work Begins Week of August 17

In addition to continued land survey work that began in July, a specific tree survey will begin the week of August 17. This work will be conducted by a certified arborist for the purpose of verifying the location and identifying the size, species, class, and condition (overall health) of each tree along the entire project corridor. This tree survey work follows the City's new tree preservation ordinance. Once completed, the City's Forestry staff will provide a final review and approval of the arborist's final survey. 


Land Survey General Information

The City of Saint Paul will be reconstructing Summit Avenue from Mississippi River Boulevard to Fairview Avenue as early as 2028. Prior to the start of construction, important survey work began the week of July 20 and will continue for approximately six weeks.

This work entails identifying the three-dimensional geolocation of several important points, from curbs, inlets, ditches, trees, utility poles, and utility covers (manholes). You may observe survey technicians, in clearly marked vests, collecting data. This activity may require surveyors to stand on people's private property for a few minutes to collect data. Survey work will help project staff model the project corridor to begin design work.

Survey crews will start near Mississippi River Boulevard and progress east along the project corridor over the course of the survey.  Work will primarily occur within the public right of way along Summit Avenue and extend onto intersecting streets as needed to collect information along the entire length of Summit Avenue to West Kellogg Boulevard at the eastern end of the project.

As part of this work, utility locating crews will also be present marking the locations of underground utilities with temporary paint and flags.  These markings are an important part of the survey and design process and help ensure accurate utility mapping. Please leave the flags in place as our survey crews will remove them as they complete their work.

Summit Avenue Regional Trail Plan

The City Parks and Recreation Department engaged community members to inform and develop a Plan for Summit Avenue that reviewed the corridor from the Mississippi River to Downtown Saint Paul. This Plan evaluated opportunities, constraints, and feasibility of a regional trail facility within the corridor and will serve as a guide to future transportation, pedestrian, and parkway improvements.  

Funding for the Plan was secured from the Parks and Trails Legacy Grant.

Summit Avenue Regional Trail Plan | Saint Paul Minnesota

FAQs

Frequently Asked Questions about the Summit Avenue Reconstruction project. The FAQs will updated as needed.

Investing in Saint Paul Streets: Common Cent 

A portion of this street reconstruction project will be paid for by a 1% local option sales tax, called Common Cent. This sales tax was approved by Saint Paul voters in November 2023. A portion of the project will also be funded through assessments to property owners adjacent to the project. The estimated assessment rate is based on a third-party special benefit analysis of the property values in the project area. Property owners will receive a notice of the estimated rate and date for a public hearing when estimated rates are available. More information on assessments can be found at www.stpaul.gov/specialassessments.